Open the perimeter and prepare the trench
A narrow section of concrete is removed along the agreed route, then a trench is prepared for the drainage system.
Concrete removal and access
The layout is planned around the foundation, existing floor, utilities, and access. We discuss which areas need to be cleared and how the work affects the usable basement during installation.